Feasibility Study
Answers before you commit
A small, fixed-fee first step that answers your biggest questions about land, budget, timeline and team, in a few weeks. It’s the first phase of every Fabcab project, and available on its own.
What it answers
The questions that come before any drawing
- What can we build on this land, and what will the site cost?
- What will the whole project cost, and how long will it take?
- Which Fabcab design concept fits how we want to live?
- Who should be on our team: builder, surveyor, engineer, lender?
- If we’re moving, how do we sequence selling, building and financing?
Three paths
Choose the path that fits where you are
Each path is a fixed-fee study with defined deliverables. Contact us for pricing.
Find & Evaluate Land
Shopping for land, or a lot in mind
- Zoning, buildable area, slope and access reviewed
- Utilities, well and septic checked early
- A budget range for building on that lot
- Priority Turnaround when you’re making an offer
Plan Your Property
You already own land
- What your site allows, from setbacks to utilities
- Fabcab layouts compared, with a budget range for each
- A 3D rendering of your preferred layout on your lot
Full Journey
You’d like a guide all the way
- Help with the land search itself
- Each candidate property evaluated
- From land search to a chosen layout within 12 months
What Fabcab brings
Five things that make the difference
1
Land first, answers early
Zoning, slope, access, utilities, well and septic reviewed before you commit.
2
Predictable cost and timeline
Established Timbercab and Modcab design concepts and materials packages, with budget ranges from the start.
3
A plan for the whole sequence
Selling, building, and bridge or construction financing, mapped together.
4
Accessible from the start
Universal design built in from the first sketch, for every stage of life.
5
A trusted team
Builders, site pros and lenders who know our homes and keep their commitments.
How it fits
On its own, or as phase 1
Not ready to commit
Feasibility Study → Your answers in a few weeks → Decide when you’re ready
If you continue to full design, the study fee is credited toward your design fee.
Ready for the full project
Design agreement → Feasibility as phase 1 → Design & permitting
Predesign and feasibility become the first phase of your project, with no separate study to buy.
Find your situation
Paths for three common starting points
Not sure which path fits? These pages describe the situations we hear most often.
The last home you’ll need to build
A single-level home designed for every stage of life.
Keep your parents close
An accessible backyard cottage, just steps from your back door.
Engineered, not improvised
A precision-built home system, with the data to back it up.
Your next step
Start your Feasibility Study
Every project begins with a feasibility phase. Tell us about your land and your plans, and we’ll recommend the path that fits.
Read the FAQs
Cost, timing, land and design: what most people ask first.
Ready to begin? Book a 30-minute introduction, and we’ll recommend the path that fits.
info@fabcab.com · 206.275.2345 · Seattle studio, by appointment
